Skip to main content

Cradlestone Solar

Cairnmead Industrial Consultants represented the client as the health and safety consultant on this project. During the implementation phase, it was our duty to ensure that all structural work conducted was completed in accordance with the Health and Safety Act.

Cradlestone Solar

How we made it safe.

Significant solar upgrade

Significant solar upgrade

Cradlestone Mall recently completed a significant solar upgrade, focusing on solar structural strengthening and expanding the existing solar PV plant. The project included the design and installation of a 1MWp grid-tied solar PV system, integrated with the mall’s standby generator system. This solar PV plant is designed to reduce the mall's energy demand by approximately 1,550,000 kWh per year. The system is continuously monitored and reported on to ensure it meets performance and energy reduction targets. By integrating with the standby generator, the mall also saves fuel during power interruptions.

Diligent efforts and dedication

Diligent efforts and dedication

Cairnmead Industrial Consultants represented the client as the health and safety consultant on this project. During the implementation phase, it was our duty to ensure that all structural work conducted was completed in accordance with the Health and Safety Act. We worked closely with the entire professional team to ensure that all were compliant. Due to their diligent efforts and dedication, we are proud to award this project our Stamp of Approval! Thank you for your hard work!

Professional Team:

Broll, Sasol, Term Project Management, Anderson Consulting, Solar Eff, Westonaria Electrical, LPC Projects (Pty) Ltd, CM Konstruksie, PICM Randfontein (Pty) Ltd, Cairnmead Industrial Consultants, Bianca Swarts.

Contact Us Today!

Thank you for contacting us! We'll get back to you soon.

*All fields are required